26 Oct 2026
The Kasol footbridge is open again
The footbridge the 2023 flood took is open again, rebuilt with the village in six weeks.
A StayCraft demo. Not real. A StayCraft demonstration site. This is the Monsoon design. The organisation, its people and its numbers are made up, and a gift or a registration here goes nowhere.
About this design All designs26 Oct 2026
The footbridge the 2023 flood took is open again, rebuilt with the village in six weeks.