26 Oct 2026
The Kasol footbridge is open again
The footbridge the 2023 flood took is open again, rebuilt with the village in six weeks.
A StayCraft demo. Not real. A StayCraft demonstration site. זהו העיצוב Monsoon. הארגון, האנשים והמספרים שלו מומצאים, ותרומה או הרשמה כאן לא מגיעות לשום מקום.
About this design All designs26 Oct 2026
The footbridge the 2023 flood took is open again, rebuilt with the village in six weeks.